Office Fit-Out Services in Riyadh and Cairo: What to Expect

From the workplace brief to move-in day: what a good office fit-out covers, which decisions shape the programme, and how to choose the team that delivers it in Saudi Arabia and Egypt.

By the NoVi Designs & Finishing team

Updated

5 min read

  • Saudi Arabia
  • Egypt
  • UAE
Visualisation

A good office fit-out does more than furnish a floor. It sets how a team meets, concentrates, welcomes clients and grows. In Riyadh, many companies, including regional headquarters moving to the city, are taking new floors in towers delivered as shell and core or Category A. In Cairo, businesses are relocating to New Cairo, Sheikh Zayed and the New Administrative Capital, often into buildings handed over with minimal finishes.

This guide sets out what to expect from an office fit-out in both cities, based on how our team at NoVi Designs & Finishing plans and builds workplaces from our offices in Cairo and Riyadh.

Start with the workplace brief

Before any drawing, agree how the office will be used. Hybrid work has changed the mix: many teams now need fewer assigned desks and more spaces for video calls and small meetings. The brief should answer a few practical questions.

  • How many people come in on a typical day, and on the busiest day?
  • Which teams need quiet focus, and which work together all day?
  • What mix of phone booths, small huddle rooms and larger boardrooms fits your meeting habits?
  • Where do visitors go: a reception, a client lounge, a majlis-style guest room?
  • What support spaces are needed: prayer rooms, pantry, storage, server or comms room?
  • How much will the team grow over the lease, and how easily must the layout adapt?

Cat A vs Cat B office fit-out

Before planning your own works, read exactly what the landlord hands over. A Cat A ceiling and lighting grid may be removed anyway under a layout full of meeting rooms, so some tenants prefer to take the space earlier in its shell-and-core condition. Either way, the handover specification defines where your scope starts.

Who usually delivers what
ElementCat A (landlord)Cat B (tenant)
Floors and ceilingsRaised floor, grid ceilingCarpet, timber or stone finishes, feature ceilings
HVAC and lightingBase system for an open floorRebalancing for rooms, feature and task lighting, controls
Fire and life safetyBase detection and sprinklersAdjustments for every new room and partition
Fit-out and brandNot includedPartitions, joinery, reception, pantry, furniture, signage

Definitions vary by building. We check the landlord's handover specification during the survey.

Office fit-out essentials: MEP, IT, acoustics and lighting

  1. Air-conditioning

    Meeting rooms and glass offices need their own zones and controls. In Riyadh summers, an open floor designed for a Cat A layout rarely performs once walls go up.

  2. IT and power

    Structured cabling, Wi-Fi coverage, a ventilated comms room, meeting-room AV and access control are coordinated with the layout from day one. See our MEP works.

  3. Acoustics

    Glass walls and hard floors look sharp and carry sound. Acoustic ceilings, wall panels, door seals and partitions taken up to the slab keep conversations private.

  4. Lighting

    Glare-free general light, daylight used without heat gain, and warmer layers in lounges. Good lighting design is also where energy is saved.

Sustainability starts with the basics: LED lighting with occupancy and daylight sensors, well-zoned air-conditioning, water-saving fittings, durable finishes and reuse of existing partitions or furniture where they still perform. If the building follows a green certification, the fit-out should respect its tenant guidelines.

Brand, furniture and wellbeing

Office interior design should say who you are without a logo on every wall. Reception, boardroom and client lounge carry most of the brand. In Saudi and Egyptian offices, hospitality matters: a well-designed guest area, often majlis-inspired, says as much as any brand book.

Furniture is selected, coordinated and installed through our FF&E service, sourced with suppliers and manufacturing partners rather than a single catalogue. For wellbeing, the basics make the difference: daylight, fresh air, low-emission paints and adhesives, sit-stand options, water points and a pantry people actually use.

Office fit-out with walnut ceiling baffles and glass meeting rooms
Visualisation

The office fit-out process and timeline

  1. Brief and test fit

    Headcount, work patterns and a first layout on the actual floor plate.

  2. Design and approvals

    Concept, detailed drawings and BOQ, then landlord and authority submissions.

  3. Procurement

    Long-lead items first: glass partitions, HVAC equipment, light fittings and furniture.

  4. Site works and commissioning

    Partitions, services, finishes and joinery, then testing of MEP, IT and life-safety systems.

  5. Move-in

    Furniture, IT set-up, snagging and handover documents before day one.

The programme depends on floor size, starting condition, decision speed and building rules, such as night-only noisy work in occupied towers. For the full sequence and approvals, read our commercial fit-out steps.

How to choose an office fit-out company

Whether you are shortlisting an office fit-out company in Cairo or a fit-out contractor in Riyadh, compare them on the same points, and ask for evidence rather than promises.

  • Design and execution under one contract, with one accountable project manager.
  • In-house coordination of MEP and IT, not an afterthought.
  • A detailed BOQ, a named specification and a fixed quote.
  • Experience with landlord approvals in your city.
  • A certified quality system and a clear site safety plan.
  • Office projects you can see, such as our corporate office design gallery.

Questions

Frequently asked questions

Straight answers to what clients ask us before a site survey. Not covered here? Ask the team directly.

Ask the team

How long does an office fit-out take?

It depends on the floor area, whether the space is shell and core or Cat A, the approvals and how quickly decisions are made. We issue a programme after the survey and test fit, when the scope is clear.

Can you help before we sign the lease?

Yes, and it is the best moment. A quick test fit on each shortlisted floor shows how many people and rooms really fit, what the landlord's handover includes and which building will need more work, so you compare options on facts.

Can we stay in our office during a refurbishment?

Often yes, by phasing the works zone by zone and scheduling noisy or dusty tasks outside working hours. It extends the programme, so we plan the phases with you before pricing.

How is the cost of an office fit-out calculated?

From the approved design: drawings become a bill of quantities, each item is priced, and you receive a fixed quote in EGP or SAR. See how interior design and fit-out costs are calculated.

Do you supply the office furniture?

Yes. We specify, coordinate and install furniture as part of the fit-out, sourced with suppliers and manufacturing partners, so it arrives in line with the site programme.

More guides

More guides

All articles
  • Office fit-out with walnut ceiling baffles and glass meeting roomsVisualisation

    Fit-out5 min read

    Commercial Fit-Out Steps: From Empty Shell to Opening Day

    The nine stages of a commercial fit-out, from brief and survey to approvals, procurement, site works, snagging and handover, with the approvals to plan for in KSA, Egypt and the UAE.

    • Saudi Arabia
    • Egypt
    • UAE
  • Stone-and-glass VIP sales pavilion with a reflecting poolVisualisation

    Commercial & retail6 min read

    Commercial Interior Architecture for Brands: Offices, Stores and F&B

    How commercial interior architecture turns brand identity into space: materials, light, wayfinding and signature elements, consistency across branches, developer sales centres and F&B interiors in Egypt and Saudi Arabia.

    • Egypt
    • Saudi Arabia

Start a project

Moving to a new office in Riyadh or Cairo?

Send us the floor plan and your move-in date. We will survey, prepare a test fit and return a programme and a fixed quote.