Construction & civil works

Construction & General Contracting

Structural, civil and architectural works for residential, commercial and industrial developments, delivered by the team that also designs and finishes, so the building is right from the concrete up.

  • ISO 9001:2015Certified quality management
  • LLA 2022Luxury Lifestyle Awards winner
  • 2Offices: Cairo and Riyadh
  • 3Markets: Egypt, KSA, UAE
Visualisation

A general contractor is judged on the parts nobody sees after handover: the concrete, the levels, the waterproofing and the services buried in the slab. NoVi Designs & Finishing brings the discipline of our interiors work to construction and civil works, planning structure, MEP and finishing as one programme from the first pour to the last snag.

Our construction work is under way across Egypt: concrete and architectural finishing for Mivida Gardens — 200 villas in New Cairo, finishing, landscape and infrastructure for Capital Hills — 240 units in the New Administrative Capital, general contracting for the Lina Farm workers accommodation in Minya, and the rehabilitation of a 13,000 m² cold storage facility with 60 cold rooms in Sadat City. Quality is managed under our ISO 9001:2015 system.

Project proof

Named projects behind the work

Figures, roles and status from NoVi's 2026 corporate portfolio. Images are original visualisations inspired by each project, not site photographs.

Villa concrete frames at golden hour
Visualisation

01Construction & General Contracting

Structural, civil and architectural works

  1. Concrete and structural works

    Foundations, frames and slabs built to the structural drawings, with sleeves and openings for services set before each pour.

  2. Masonry, plaster and waterproofing

    Blockwork, plastering, roof and wet-area waterproofing and insulation, inspected before they are covered.

  3. Architectural finishing

    Windows and aluminium, flooring, stairs, ceilings, paint, doors and external finishes; see finishing works.

  4. MEP integration

    Electrical, plumbing, HVAC, fire and low-current systems coordinated with the structure; see MEP works.

  5. Infrastructure and external works

    Site infrastructure, interlock, gates, pools and landscape, delivered with the buildings.

  6. Industrial rehabilitation

    Refrigeration, cold-room doors, roof insulation, epoxy floors and loading docks in operating facilities.

Aerial view of a residential compound under construction
Visualisation

02Construction & General Contracting

Construction projects under way

Each project below is under construction, with our role stated exactly as contracted.

  • Mivida Gardens — 200 villas, New Cairo: concrete and architectural finishing. Under construction.
  • Capital Hills — 240 units, New Administrative Capital: finishing, landscape and infrastructure. Under construction.
  • Lina Farm workers accommodation, Minya: general contractor for the main staff building and two gate buildings, from construction to MEP and interior finishing.
  • Cold storage facility rehabilitation, Sadat City: main renovation contractor for 13,000 m² and 60 cold rooms.
Architect's studio: scale model, drawings and material samples on the desk
Visualisation

03Construction & General Contracting

Civil and finishing contractor, one programme

Most delays on site come from the hand-over between the structural contractor and the finishing contractor: missing sleeves, wrong levels, slabs that must be broken for services. Because we carry both, from shell and core to handover, those decisions are made once, on coordinated shop drawings. Our technical team supports every package with design development, BOQ, quantity surveying and value engineering, and QA/QC and health and safety run on site from the first day.

Where the design is ours too, a design and build contract removes one more interface; see also our architectural design service.

04Construction & General Contracting

How a construction project runs

  1. Tender review and BOQ

    We study the drawings and specifications, survey the site and price the works line by line.

  2. Shop drawings and coordination

    Structure, MEP and finishes are coordinated on shop drawings, with value engineering where it helps the budget.

  3. Procurement and approvals

    Materials ordered against approved submittals; permit and authority documentation prepared and coordinated with the owner.

  4. Construction and execution

    Structure, services and finishing sequenced as one programme, with regular progress reporting.

  5. Quality and project control

    Inspections before each stage is covered, HSE on site and snagging under our ISO 9001 system.

  6. Testing and handover

    Systems tested and commissioned, snags closed and the handover documentation delivered.

Questions

Frequently asked questions

Straight answers to what clients ask us before a site survey. Not covered here? Ask the team directly.

Ask the team

Do you build villas from the foundations?

Yes, in Egypt. We carry concrete and structural works, then MEP and finishing, as at Mivida Gardens, where we deliver concrete and architectural finishing for 200 villas.

Can you work as a subcontractor to a main contractor?

Yes. On large residential developments we deliver defined scopes, such as concrete and architectural finishing, within the main contractor's programme. We also act as general contractor or main renovation contractor where the client contracts us directly.

Do you offer general contracting in Saudi Arabia?

No. In the Kingdom we provide design, coordination and fit-out and finishing delivery from our Riyadh office. Construction and civil works are delivered in Egypt.

Do you handle building permits?

We prepare the drawings and documents that permits and developer approvals require and coordinate the submissions with the owner, in whose name permits are normally issued.

Can you take over a project started by another contractor?

Yes. We survey and record the existing works, flag anything that must be corrected, and price the remaining scope from a fresh BOQ before we start.

How is quality controlled on site?

Under our ISO 9001:2015 certified system: inspections before each stage is covered, material checks against approved samples, health and safety procedures, and documented snagging before handover.

Start a project

Build it right from the ground

Send us the drawings, the BOQ or the tender package. We will review the scope and come back with a site visit and a priced proposal.