Fine finishing is decided long before the marble arrives: in the specification, the order of trades and the checks made before each stage disappears behind the next.
Contact Us
Cairo Head Office
Riyadh Office

Finishing works
Fine finishing is decided long before the marble arrives: in the specification, the order of trades and the checks made before each stage disappears behind the next.
NoVi Designs & Finishing delivers luxury finishing works for villas, apartments and offices with nothing left vague. Every stone, paint system and ceiling detail is named in a bill of quantities before work starts, then executed and inspected stage by stage by one accountable team.
Our finishing work also runs at compound scale: we deliver concrete and architectural finishing for Mivida Gardens — 200 villas in New Cairo, and finishing, landscape and infrastructure for Capital Hills — 240 units in the New Administrative Capital. Every project runs under our ISO 9001:2015 quality system.
Project proof
Figures, roles and status from NoVi's 2026 corporate portfolio. Images are original visualisations inspired by each project, not site photographs.



300 m²
New Cairo
Design & finishing: interior and exterior, joinery, lighting, kitchen and bathrooms

850 m²
Cairo
Design & finishing: modern and neo-classic villa — pool, staircase, living and bedrooms

01Finishing Works
New walls, openings and plaster set straight and plumb, with edge protection that keeps corners true for years.
Wet areas, terraces and roofs waterproofed and tested before tiling, on screeds set to finished levels.
Slabs chosen from the actual batch and dry-laid first, so veining, shade and joint lines are set out, not improvised.
Framed gypsum board ceilings, coves for hidden lighting, curtain pockets and bulkheads for air conditioning.
Complete paint systems, wallpaper, decorative plaster and stone or wood cladding, approved on sample panels first.
Doors, wardrobes, kitchens, sanitary ware and electrical accessories installed to the drawings.

02Finishing Works
In Egypt the ladder runs from lux to super lux, ultra super lux and high-end, and it mostly measures how much natural stone, gypsum detail and custom joinery a home contains. In Saudi Arabia clients usually describe the starting point, a villa received as a bare structure, then raise the level room by room, with the majlis finished above the family wing.
The labels are shorthand, not standards. We turn whichever one you use into named materials and grades at three budget levels, so you can place book-matched marble in the reception and sensible porcelain in service areas. See finishing in Egypt or villa finishing in Riyadh for market detail.

03Finishing Works
04Finishing Works
As-built survey, layout, 3D, selections, shop drawings and a priced BOQ you approve before anything is ordered.
Removals, new walls, conduits, plumbing, AC piping and low-current cabling, inspected before they are covered.
Straight plaster, tested waterproofing, then gypsum ceilings with lighting and AC openings set out.
Marble and porcelain laid to the approved setting-out while joinery is still in production.
Execution typically 4–8 months overall
Doors, kitchens, wardrobes and fittings installed, then the final paint coat once dusty work ends.
Joint inspection against the drawings, snag closure, deep cleaning and handover documents.
05Finishing Works
In Egypt most projects begin with a developer handover and a compound rulebook in New Cairo, Sheikh Zayed, the New Administrative Capital or the North Coast; homes include Villette Residence (300 m²) and Katameya Creek Town Residence (200 m²). In Riyadh the typical job is a villa received as a structure. Homeowners in the UAE are served from both offices. Upgrading a lived-in home? See renovation.






06Finishing Works
A price per square metre means little until the specification behind it is written. After survey and design you receive a BOQ where every item carries a quantity, a material and a rate, confirmed in a fixed quotation before work starts. We do not publish per-m² prices. Our guide to interior design services cost adds regional context; to start, book a site survey.
From the portfolio
Real photography from our project galleries.
Questions
Straight answers to what clients ask us before a site survey. Not covered here? Ask the team directly.
Ask the teamIt depends on the finishing level, the starting condition and the specification of stone, joinery and air conditioning far more than on area alone. We price a detailed BOQ after survey and design and confirm it in a fixed quotation, so you can adjust items instead of negotiating one lump sum.
Mostly the share of natural stone, gypsum detail, custom joinery and premium fittings. Because the labels are not standardised, we define each level in named materials in the BOQ.
Execution typically takes four to eight months depending on area, starting condition and scope. Custom joinery and imported stone are ordered as soon as their selections are approved.
Both. For semi-finished units we survey what the developer installed, keep what can stay and price only the works you need, listed separately so nothing is paid for twice.
Yes. We review the drawings, flag what is missing, produce the shop drawings needed on site and price the work from a BOQ.
Often, yes. We agree in advance which items you supply, their specification and delivery dates, so the BOQ, programme and responsibilities stay clear.
Workmanship is covered by the terms written into your contract, and installed materials carry their manufacturers' warranties, handed over with the documents. Ask for the exact wording before signing.