Design & build: architecture, steel structure, MEP, façade, FF&E coordination
Contact Us
Cairo Head Office
Riyadh Office

Design & build
The team that draws your project prices it from its own bill of quantities and builds it, so responsibility never changes hands between the first sketch and the keys.
NoVi Designs & Finishing is a design and build company: one coordinated team connecting design, technical development, execution and handover. You sign one contract for the drawings, the engineering, the site works and the furniture, and you deal with one party accountable for all of it.
The model scales from a single villa to community buildings: we are the design and build contractor for The Marquee, a 1,500-seat events venue in Taj City, New Cairo, and for the Kinda Community Center on the same development. Quality is managed under ISO 9001:2015, from our offices in Cairo and Riyadh.
Project proof
Figures, roles and status from NoVi's 2026 corporate portfolio. Images are original visualisations inspired by each project, not site photographs.

≈ 4,675 m²
Taj City, New Cairo · Madinet Masr
Design & build: architecture, steel structure, MEP, façade, FF&E coordination

Taj City, New Cairo · Madinet Masr
Integrated design & build: architecture, fit-out, MEP, FF&E, courtyard and pool

330 m²
VIP sales office · 330 m² BUA
Design & build: full interior and exterior renovation

4 main gates
6th of October City, Giza
Specialist design & build: steel, Alucobond cladding, lighting and gate systems

01Design & Build
Six capabilities, coordinated into one drawing set, one programme and one price.
Architectural design, façades and interior design, developed with 3D views and shop drawings.
Structural, civil and architectural works for new buildings, extensions and annexes.
Complete finishing works, cladding and façade finishes, executed to the approved drawings.
Electrical, plumbing, HVAC and low-current systems coordinated with the architecture, not added after it.
Hardscape, softscape, pools, pergolas and gates, drawn with the building rather than added after it.
Furniture, fixtures and equipment selected, procured and installed, then testing, styling and documentation.

02Design & Build
For Madinet Masr in Taj City we are delivering The Marquee (approx. 4,675 m²: architecture, steel structure, MEP, façade, FF&E coordination and landscape) and the Kinda Community Center (architecture, interior fit-out, MEP, courtyard, pool and external works). In 6th of October City we are the specialist design and build contractor for the four main Lina Farm gates.
At a smaller scale, the Qatari Diar VIP Sales Office (330 m²) was a full interior and exterior renovation designed and built by the same team; villas and apartments follow the same single-contract route. Browse more in our portfolio.
03Design & Build
| Design & build | Separate designer + contractor | |
|---|---|---|
| Responsibility | One party answers for drawings and site | Each side can blame the other for one defect |
| Pricing | Priced from the designers' own BOQ | Re-measured and re-priced; variations appear later |
| Programme | Design, procurement and site works overlap under one plan | Tendering adds a gap between design and build |
| Your time | One point of contact and one progress report | You coordinate the parties yourself |
04Design & Build
Survey, brief, layouts, mood boards and 3D views of the key spaces.
Shop drawings, BOQ, value engineering and the FF&E schedule, all approved before procurement.
Materials ordered against approved samples; developer and authority approvals prepared and coordinated.
One project manager runs trades, subcontractors and progress reporting on site.
Typically 4–8 months for interior projects
QA/QC inspections, health and safety, and snagging at every stage, not only at the end.
Furniture installation, styling, system testing and the full documentation package.
05Design & Build
In Egypt, turnkey contracts usually start from a developer handover in New Cairo, Sheikh Zayed, the New Administrative Capital or the North Coast; see design and build in Egypt. In Saudi Arabia they start from a villa received as a structure or a commercial unit in Riyadh; see design and build in Saudi Arabia. UAE clients are served from both offices.







06Design & Build
From the portfolio
Real photography from our project galleries.
Questions
Straight answers to what clients ask us before a site survey. Not covered here? Ask the team directly.
Ask the teamIt takes both halves of a project under one contract: design (layouts, 3D, MEP coordination, shop drawings, BOQ) and delivery (procurement, site works, inspections, handover). You approve one scope, one price and one programme.
Not usually, compared like for like. A separate contractor prices someone else's drawings, adds risk and claims variations for gaps. Our price comes from our own BOQ, leaving less unpriced risk.
Interior execution typically runs four to eight months after design, depending on area, starting condition and scope. Long-lead joinery and imported materials are ordered as soon as their part of the design is approved.
We prepare the drawings and documents that developers, building managements and authorities request, and schedule the works around approvals. Where a licensed consultant must stamp a submission, we coordinate with that party.
Yes. We review the drawings for buildability, add the missing shop drawings and price the works from a BOQ. The reverse also works: take our design package to tender, then come back for execution.
Payments are tied to milestones in the contract and programme, each linked to completed, inspected work rather than a calendar date, and agreed in writing before signature.
Start a project
Tell us the project type, area and current condition. We will arrange a site survey and return a turnkey scope, deliverables and a realistic programme.