Office fit-out in Cairo, from empty shell to a working HQ
Most offices in Cairo's business parks and administrative towers are handed over as core and shell, or with a basic landlord finish. Turning that space into a headquarters your team actually wants to work in takes more than finishing works. It takes a layout that fits how you work, MEP that the building will approve, a schedule that respects tower rules, and one contractor who answers for all of it. NoVi Designs and Finishing delivers office fit-outs as a single accountable design and build team, from the first site survey to handover.
Shell and core, Cat A or Cat B, know what you are getting
Before comparing quotations, be clear on the starting point. A shell and core unit usually has the structure, façade and main building services only. A Cat A finish adds base items such as ceilings, raised floor, basic lighting and HVAC distribution. A Cat B fit-out is everything that makes the space yours: partitions, meeting rooms, branded reception, kitchenette, final lighting, data, furniture and joinery. Many tenants in New Cairo and the New Administrative Capital receive something in between, so our survey records exactly what exists and what can be reused before anything is designed.
What our office fit-out covers
Space planning and test fits
We start with headcount, departments, growth plans and how your teams meet and collaborate. Test fits show how many workstations, meeting rooms, focus rooms and support spaces the floor can realistically hold, which is also the best way to judge a unit before you sign the lease.
Office interior design
Concept, mood boards, 3D visuals, material boards and working drawings that carry your brand through reception, boardroom and work floor, while staying practical to clean, maintain and expand.
MEP and infrastructure
HVAC zoning for meeting rooms and server rooms, lighting design, small power, data and light-current cabling, access control and fire and life safety, all designed and coordinated with building management so approvals are not a surprise at the end. Smart office controls can be integrated through partners such as HDL.
Finishing works
Gypsum board and glass partitions, acoustic treatment for meeting rooms and executive offices, ceilings, flooring and raised floors, wet areas and pantries, feature and branded walls.
Custom joinery and furniture
Reception desks, storage walls, boardroom tables and built-in joinery made to measure, plus coordination of workstations and loose furniture with floor boxes and cabling.
Handover
Snagging, testing, as-built drawings and a defects liability period, so your facility team receives a documented office, not just a finished one.
Fitting out an office in New Cairo, the New Capital, Sheikh Zayed or October
We work across Greater Cairo, New Cairo, the New Administrative Capital, Sheikh Zayed and 6th of October. In each of these areas, the building itself shapes the project as much as the design does.
- Landlord fit-out guidelines. Most business parks and admin towers issue a tenant fit-out manual and require drawing approval before works start, often with a refundable deposit and contractor insurance.
- Fire safety and civil defence. Sprinkler and smoke detector layouts, emergency lighting, exit routes and fire-rated materials must suit the building's system and civil defence requirements. Moving a partition can mean moving sprinklers.
- Working hours and logistics. Occupied towers commonly restrict noisy works to evenings or weekends, and book goods lifts and loading bays in time slots. We plan the programme around these rules from day one.
- Building services tie-ins. Chilled water or VRF connections, electrical load allocation and riser access all need building management sign-off.
- Long-lead items. Imported furniture, frameless glass partitions, VRF units and some lighting fixtures can take weeks to arrive, so they are ordered early, right after design sign-off.
How we deliver your office fit-out
- Discover. Site survey, as-built 2D layout of the unit and a review of the building's fit-out guidelines.
- Design. Space plan, concept, 3D visuals, material selection, shop drawings and an itemised BOQ quotation, agreed with your team before any work starts.
- Deliver. Execution with regular progress updates and site checks that the work matches the approved shop drawings.
- Handover. Snagging, as-built drawings and a defects period, ready for your team to move in.
What drives the cost of an office fit-out
We do not publish price lists, because two offices of the same size can differ widely. Your quotation is an itemised BOQ prepared after the survey. The main cost drivers are:
- The starting condition of the unit, shell and core or partly finished.
- The ratio of open plan to enclosed rooms, and the amount of glass partitioning.
- Acoustic targets for meeting rooms, call booths and executive offices.
- HVAC changes, extra cooling for server rooms and electrical upgrades.
- Data, AV, access control and smart office systems.
- Material and furniture specification, local or imported, standard or custom joinery.
- Night or weekend working required by the building, and any phasing.
Before you sign the lease, a quick checklist
- Ask for the landlord's fit-out manual and approval process.
- Confirm what is included in the handover condition and what you are allowed to change.
- Check the electrical load, HVAC capacity and riser access available to your unit.
- Request a test fit to confirm the floor works for your headcount.
- Agree your target move-in date early, so long-lead items can be ordered in time.
Why companies choose NoVi for office fit-out
- One accountable team for design, MEP, finishing, joinery and furniture, part of NoVi Holding.
- Clear scope and schedule before work starts, with an itemised BOQ rather than a lump sum guess.
- ISO 9001 quality management for finishing and decoration works.
- Documented handover with as-built drawings and a defects period.
- Execution in Egypt and Riyadh, and design-only services for clients in the UAE, Qatar, Kuwait and Bahrain.
See our work in corporate office design, or explore clinic fit-out, restaurant and café fit-out and hotel and hospitality fit-out.
Start with a site survey
Share your unit location, area and target move-in date and we will plan the next step with you. Book a site survey or request a proposal.