A show unit, a sales centre or a clubhouse is not an ordinary interior job. It is a sales tool with a launch date attached, and it is the first physical proof buyers see of a compound that may still be a construction site. NoVi Designs and Finishing works with real-estate developers as a single design and build partner for these spaces: interior and architectural design, finishing, MEP, fit-out and furniture under one team, so your project manager deals with one contract and one programme instead of five.
We take on compound projects across New Cairo, Sheikh Zayed, 6th of October, the New Administrative Capital, the North Coast and El Gouna. NoVi executes fit-out projects in Egypt and in Saudi Arabia.
What we fit out for developers
- Show units and model villas: furnished model apartments, duplexes, townhouses and villas that buyers walk through and that your marketing team photographs for the launch campaign.
- Sales centres: reception, model display and masterplan zones, closing rooms, meeting rooms, back office, pantry and washrooms, built to handle weekend crowds and long opening hours.
- Clubhouses: gyms, pool changing rooms and showers, multipurpose halls, cafes, kids areas, lounges and admin offices.
- Common areas: entrance buildings, gate houses, building lobbies, elevator lobbies and corridors, pool houses, rooftops and landscape features.
Show units and sales centres: the launch date decides everything
When a launch event, an ad campaign or a sales season is booked, the show unit has to be finished, cleaned, dressed and lit before the photographer arrives. That changes how the job is planned. Long-lead items such as imported tiles, custom joinery, lighting and loose furniture are ordered first, often before the shell is fully ready. Work is sequenced backwards from the launch day, with buffer time for snagging and styling, not just for construction.
A show unit also has to photograph well. That means controlled lighting, clean ceiling lines, hidden AC grilles where possible, consistent colour temperature, and finishes that look right on camera as well as in person. The sales centre has a second job: it must work every day as an office, with comfortable acoustics in closing rooms, reliable power and data for the sales team, and a layout that guides visitors from the masterplan to the model and then to a meeting table.
The real trade-off: show unit spec versus delivery spec
The most common mistake we see in the market is a show unit finished far above what buyers will actually receive. It sells well on launch day and creates disputes at handover. We recommend agreeing early, with your sales and legal teams, which items in the show unit match the delivery specification and which are clearly marked as upgrades or furniture only.
- Flooring, wall finishes, doors, sanitary ware and kitchen layout usually follow the delivery spec, or a clearly defined upgrade package.
- Loose furniture, decor, curtains, art and feature lighting can be more expressive, because buyers understand they are styling.
- A simple spec board in the unit, listing what is included in delivery, protects the developer and builds trust with buyers.
Clubhouses: built for daily use, not just for the opening
A clubhouse is used hard, every day, for years. The design has to survive wet feet, gym equipment, children and events. The points we plan for from the first drawing:
- Wet areas: waterproofing, slopes to drains, anti-slip flooring, moisture-resistant ceilings and proper extraction in changing rooms, showers and pool surrounds.
- HVAC and ventilation: gyms and multipurpose halls carry high loads and variable occupancy, and pool areas need humidity control.
- Acoustics: halls, cafes and kids areas need sound absorption so the building does not echo, and gym noise should not travel into quiet zones.
- Fire safety and accessibility: escape routes, fire-rated materials where required, step-free access, accessible washrooms and clear signage, coordinated with the consultant and civil defence requirements.
- Maintenance: finishes that facility teams can clean and replace locally, with spare stock handed over.
For clubhouse cafes we apply the same thinking we use in our restaurant and cafe fit-out work, and you can see related work in our sports club designs gallery for gyms and halls and our restaurant design gallery for cafes.
Common areas: one standard across many buildings
Entrance lobbies, elevator lobbies and corridors are repeated across dozens of buildings in a compound. The goal is a repeatable specification: one approved design, one materials list, and one detail set that can be rolled out building by building. This keeps quality consistent, simplifies procurement, and allows phased handover that follows your construction and delivery schedule. Rooftops and landscape elements are coordinated with the landscape consultant so levels, drainage, lighting and planting work together. See our residential compound design, landscape design and rooftop design galleries.
Working inside a live compound
Many clubhouses and common areas are fitted out while residents have already moved in. That needs a site plan agreed with compound management before mobilisation: access gates and routes for materials, security registration for workers, permitted working hours, noise and dust control, protected paths for residents, and daily cleaning. We also coordinate with the developer's main contractor and the project consultant so our work fits their programme, their approvals process and the compound rules.
Documentation you receive
- Concept design, 3D visuals and a detailed BOQ for approval.
- Shop drawings for joinery, ceilings, MEP and special details, submitted for consultant approval.
- Material samples and, where needed, a mock-up room or a sample bay before full production.
- As-built drawings, material schedules and maintenance notes at handover.
- A defects liability period agreed in the contract.
What drives the cost
We do not publish price ranges, because every developer brief is different. The main cost drivers are:
- Area and number of units or buildings, and how much of the spec is repeated.
- Shell condition at handover to us: plastered or bare, MEP first fix done or not.
- Finish level and how much is imported versus locally sourced.
- Custom joinery, feature ceilings and lighting design.
- MEP scope, especially HVAC for halls and gyms and wet area works.
- Furniture, decor and styling packages for show units.
- Programme pressure: a fixed launch date may require night shifts or parallel crews.
- Site logistics inside a live or remote compound, such as the North Coast or El Gouna.
What to prepare before the site visit
- Architectural drawings and the current MEP layouts, in CAD if available.
- The buyer delivery specification for the units.
- Your launch or opening date and any fixed marketing milestones.
- Brand guidelines and any moodboard from your marketing team.
- Compound management rules and main contractor contacts.
How the process works
- Brief and site visit with your development and marketing teams.
- Concept design, visuals and a priced BOQ.
- Design development, shop drawings and consultant approvals.
- Samples and mock-up approval, then early procurement of long-lead items.
- Execution with a programme tied to your launch or handover dates.
- Styling, snagging, cleaning and handover with as-built documents.
If your project also includes hospitality, offices or retail inside the compound, see our hotel and hospitality fit-out, office fit-out and retail store fit-out pages. For finished residential units, see villa finishing in New Capital, villa finishing in Sheikh Zayed, apartment finishing in New Cairo and our luxurious residential design gallery.