Contact Us

Egypt

Cairo Head Office


Saudi Arabia

Riyadh Office

Residential Design & Build · Sheikh Zayed

Villa Finishing in Sheikh Zayed and West Cairo, Designed and Built by One Team

Turnkey villa finishing in Sheikh Zayed, 6th of October and New Zayed: design, MEP, finishes, kitchens, landscaping and furniture under one contract.

Villa finishing in Sheikh Zayed is what NoVi Designs and Finishing does as one design and build contractor: interior design, MEP, finishing works, kitchens, wardrobes, smart home, exteriors, gardens and furniture under one contract, one schedule and one accountable team. We take villas, twin houses and town houses in Sheikh Zayed, New Zayed and 6th of October from core and shell, semi-finished or an older finish to a furnished home ready to move into. Execution typically takes 4 to 8 months depending on scope, and every quote follows a survey of your actual villa.

Book a site survey and we start by documenting the existing condition and the compound rules, then agree the scope with you.

Two kinds of villa projects in Zayed

Sheikh Zayed is more compact than October and many of its compounds have been lived in for years, so the brief usually falls into one of two groups.

  • New villas in New Zayed and newer phases: units handed over as core and shell or semi-finished, where everything inside starts from the layout. This gives the most design freedom, and the key decisions are the furniture and kitchen layout, the AC system and the lighting plan before any MEP work begins.
  • Upgrading or renovating an established villa: homes finished ten or more years ago that need more than paint. Before a design is fixed we check the electrical panel and earthing, old plumbing and pumps, waterproofing on roofs, terraces and wet areas, and whether the layout can open up the kitchen or add en-suite bathrooms.

Where we work across West Cairo

We work in compounds across Sheikh Zayed, including the established gated communities along the 26th of July Corridor and the Cairo Alexandria Desert Road, the original numbered districts of the city, and the New Zayed extension where new compounds keep launching. We also cover 6th of October and the Palm Hills communities on the Zayed and October border. Naming these areas tells you where our survey team goes, not where we have built. Our gallery pages below show the finish level you can expect.

Compound fit-out rules

Compound management in Zayed usually asks for drawings before works start, contractor and worker registration, set working hours, rules for deliveries and debris removal, and often a refundable fit-out deposit. Facades, pergolas, boundary walls, window changes and AC outdoor units normally have approved designs and locations. The exact rules are set by each compound and can change, so we review them with you during the survey, prepare the drawings they request and design within the guidelines so nothing finished has to be undone.

What we deliver

  • Interior design: concept, mood boards, 3D visuals, material selection, BOQ and shop drawings.
  • MEP works: electrical load calculation, panels, plumbing, AC routing (split, concealed or ducted) and lighting design.
  • Finishing works: flooring, gypsum ceilings, paint, wall cladding, doors and joinery.
  • Kitchens and wardrobes: designed and built to fit. See our kitchen design and build service.
  • Smart home: wiring planned before plastering and ceilings. See home automation.
  • Exteriors and outdoor areas: facades within compound guidelines, terraces, roof gardens, pool surrounds and landscape coordinated with the interior.
  • Furniture and decor: supplied and installed, so you receive a furnished home.
  • Handover: snagging, as-built drawings and a defects period.

Designing a villa for West Cairo's climate

Zayed sits on the desert edge west of the Nile, with dust, strong western sun and hot summers. On villas the effect is largest on roofs, west-facing facades and outdoor areas, so we plan for it in the design:

  • Well-sealed aluminium or uPVC windows, with double glazing on exposed facades, to keep dust and heat out and reduce the AC load.
  • Roof insulation and waterproofing before any roof garden or terrace finish goes on top.
  • AC sized for each floor and double-height space, with outdoor units in approved, shaded and serviceable spots.
  • UV-stable, slip-resistant and lighter-coloured outdoor finishes, with drainage and irrigation planned before landscaping.
  • Where a villa has a basement, damp and waterproofing are checked before it becomes a living space, gym or cinema room.

What drives the cost of finishing a villa in Zayed

There is no honest single price per square metre for a villa. Cost depends on the handover condition or the state of the existing finish, the built area and number of floors, the number of bathrooms, the AC system, smart home and lighting, the kitchen and wardrobe specification, exteriors and landscape, and imported materials that move with the exchange rate. NoVi quotes from an itemised BOQ after the site survey and design, and any change during execution is approved in writing.

Common mistakes to avoid

  • Starting electrical and plumbing before the furniture and kitchen layout is approved.
  • Renovating finishes in an older villa without checking the wiring, pipes and waterproofing behind them.
  • Leaving AC and smart home wiring until after ceilings and plastering.
  • Changing a facade or adding a pergola without the compound's approval.
  • Splitting the job between separate tradesmen with no single party responsible.

How a project runs

  1. Discover: site survey, as-built layout, handover condition and compound rules.
  2. Design: style direction, 3D visuals, material list, BOQ and shop drawings.
  3. Deliver: execution and supervision, typically 4 to 8 months depending on scope, with progress updates and site checks against the shop drawings.
  4. Delight: snag list, handover and help with moving in.

Owners living abroad approve the design on mood boards, 3D views and a priced BOQ, then receive regular progress updates with photos, so they can follow the villa remotely and plan visits around key milestones.

Why NoVi

  • One accountable design and build contractor from survey to handover.
  • ISO 9001 certified quality management for finishing and decoration works.
  • Luxury Lifestyle Awards 2022 winner, Best Luxury Villa Interior Design, Egypt.
  • Suppliers such as Schneider, Futec, Mazloum, Crystal Asfour, HDL and SEDAR, with materials ordered against the approved BOQ.

See our work: luxurious residential design, modern residential design, neo-classic residential design and villa exteriors. For the full service, see residential design and build for villas and homes.

Related pages

Book a site survey in Sheikh Zayed

Book a site survey, or call or WhatsApp +20 106 778 8687, landline +20 2 2749 8958. Office: Bavaria Town Towers, Kattameya Road, Tower 3, 9th Floor, Unit 91, Cairo. Sunday to Thursday, 10:00 to 18:00. We work in compounds across Sheikh Zayed, and booking a few days ahead helps us schedule the drive to West Cairo.

Projects nearby

Our work in and around Sheikh Zayed

All case studies

Integrated project delivery

Six stages. One line of responsibility.

From the first concept to the keys, one coordinated team owns every stage.

Architect's studio: scale model, drawings and material samples on the deskVisualisation
  1. Concept, design & visualisation

    Concept design and 3D visualisation that fix the direction before anything is priced or built.

    • Concept
    • 3D views
  2. Technical development & FF&E coordination

    Shop drawings, BOQ and value engineering, with furniture, fixtures and equipment coordinated alongside the architecture.

    • Shop drawings
    • BOQ
    • Value engineering
  3. Procurement & approvals

    Materials, suppliers and approvals secured in sequence, so the site never waits on a decision.

    • Suppliers
    • Approvals
  4. Construction & execution

    Structure, finishing, MEP and landscape delivered by coordinated site teams against one programme.

    • Site teams
    • One programme
  5. Quality & project control

    QA/QC, HSE, inspections and snagging built into the work, not left to the end.

    • QA/QC
    • HSE
    • Snagging
  6. Integrated solutions & handover

    Furniture installation, styling, testing and documentation, then the keys.

    • Styling
    • Testing
    • Documentation

Questions

Frequently asked questions

Straight answers to what clients ask us before a site survey. Not covered here? Ask the team directly.

Ask the team

Do you finish villas in Sheikh Zayed compounds?

Yes. We work in compounds across Sheikh Zayed, New Zayed and 6th of October, and coordinate drawings, permits, working hours and site access with compound management.

Can you renovate an older villa in Zayed, not only new units?

Yes. For established villas we check the electrical panel, plumbing, pumps and waterproofing before designing, so new finishes are not laid over old problems.

How much does villa finishing in Sheikh Zayed cost?

It depends on the handover condition, built area and floors, bathrooms, AC system, smart home, kitchen and wardrobe specification, exteriors and imported materials. We quote from an itemised BOQ after the site survey rather than a generic price per square metre.

How long does finishing a villa take?

Execution typically takes 4 to 8 months depending on scope, after the design and BOQ are approved.

Do you handle facades, gardens and pools too?

Yes. Facades within the compound guidelines, terraces, roof gardens, pool surrounds and landscape can be included in the same contract.

I live abroad. Can you manage the project?

Yes. Design is approved on mood boards, 3D views and a priced BOQ, and you receive regular progress updates with photos during execution.

Sheikh Zayed

Book a site survey

Tell us about the property and we will arrange a visit, a video call or a call back.

  1. What you need
  2. Your project
  3. Meet the team
  4. Your details

Step 1 of 4

What do you need?

Choose all that apply — we’ll bring the right specialists to your project.

I am a…
Services · choose one or more
  • Free consultation
  • Reply within one business day
  • ISO 9001 certified quality