Residential Design & Build · New Cairo

Apartment Finishing in New Cairo & Fifth Settlement: Levels, Costs and Timelines

A practical guide to finishing apartments and villas in New Cairo compounds: handover types, compound rules, finishing levels, cost drivers and NoVi's design & build process.

Apartment finishing in New Cairo and Fifth Settlement means turning a core & shell or semi-finished unit into a home ready to live in: interior design, electrical, plumbing and AC works, plastering and paint, flooring and ceilings, kitchen and wardrobes, then handover, all within your compound's rules. NoVi Designs & Finishing does this as a single design & build contractor accountable from survey to handover, working in compounds across New Cairo and Fifth Settlement.

Book a site survey and we will start by documenting your unit's existing condition and defining the scope.

Why finishing in New Cairo is different

How units are handed over

  • Core & shell: structure and external walls; most interior work starts from scratch, which gives the most design freedom.
  • Semi-finished: usually plastering and basic electrical and plumbing conduits, which often need adjusting to the new layout, AC and lighting plan.
  • Fully finished by the developer: work is typically a redesign or upgrade of kitchens, bathrooms, lighting or adding smart home.

What is actually delivered depends on your developer contract, so we always begin with a site survey and an as-built drawing.

Compound rules and approvals

Most New Cairo compounds have fit-out regulations. These typically include submitting drawings before works begin, registering the contractor and workers, a refundable deposit in some compounds, set working hours, and rules for material deliveries and debris removal. Requirements differ from one compound to another, so check your compound's rules early to avoid delays. NoVi's team can advise on coordinating with compound management during the site survey.

Logistics

Deliveries into a gated compound need coordination with gates and delivery windows, and on-site storage has to be planned around the work sequence. A contractor based nearby spends less time travelling and can visit the site more easily.

We are local

NoVi's Egypt office is in Bavaria Town Towers on Kattameya Road, close to the compounds where many of our projects are.

Finishing levels explained: lux, super lux, ultra super lux, high lux

These labels are common in Egypt but have no official standard; each contractor defines them differently. Treat them as a rough description and rely on the written BOQ. Broadly, this is what changes as you go up:

ItemLuxSuper luxUltra super lux / high lux
FlooringLocal ceramic or porcelainLarger-format porcelain, sometimes parquet in bedroomsMarble, imported porcelain or engineered/solid wood
CeilingsPaint with simple gypsumGypsum board in reception and corridorsFull ceiling design with concealed lighting
Electrical and lightingBasic pointsExtra points and spotlightsFull lighting design, smart home ready
ACSplit unit preparationConcealed routing or ducted-readyDucted or central AC integrated into ceilings
Bathrooms and kitchenStandard sanitary wareHigher-tier brands, designed kitchenConcealed fittings, natural surfaces, custom joinery

What drives the cost of finishing in Fifth Settlement

There is no single price per square metre that applies to every unit. The cost of finishing depends on the drivers below, and material prices in Egypt change often, so any per-metre figure you see online can go out of date fast and rarely matches your own specification. It is more useful to understand what moves the cost:

Cost driverWhy it matters
Area and number of bathroomsWet areas and kitchens cost more per m² than bedrooms.
Handover conditionCore & shell needs more work; semi-finished may need demolition and re-routing.
MEP changesMoving a kitchen or bathroom adds work and approvals.
AC systemDucted and central systems need ceilings, ducts and early coordination.
Kitchen and wardrobesMaterials, hardware and custom manufacturing are a major budget line.
Smart homeWiring and control points must be planned before plastering and ceilings.
Imported materialsExposed to exchange rates and lead times.
Compound rulesRestricted hours and deposits affect schedule and indirect cost.

That is why NoVi quotes from a BOQ (bill of quantities) after the site survey, based on your actual scope and materials, not from a generic rate.

Common mistakes when finishing compound units

  • Starting before the design: laying electrical and plumbing before the furniture and kitchen layout is approved often leads to demolition and rework.
  • Forgetting AC and smart home: their wiring and routing must come before ceilings and plastering; adding them later is usually more expensive and harder to do well.
  • Accepting a quote without a BOQ: a per-metre price with no itemised list of works and materials invites disputes and extra charges during execution.
  • Ignoring compound rules: starting works before management approval can get the site stopped and delay the schedule.
  • Splitting responsibility across separate tradesmen: when something goes wrong, it is hard to know who is responsible, and you end up coordinating between them.

Our process: four stages from survey to handover

  1. Discover: site survey and an as-built 2D layout of your unit, plus a discussion of your needs.
  2. Design: style direction and mood boards, 3D shots, material list, BOQ, suppliers list and shop drawings.
  3. Deliver: execution typically takes 4 to 8 months depending on scope, with progress updates and on-site checks that works comply with the shop drawings.
  4. Delight: handover of your finished home.

See our residential design & build services.

Projects in and around New Cairo

NoVi has delivered projects in compounds including Hyde Park, Mountain View, Midtown New Cairo, MiVida, Stone Residence Katameya, La Vista City, Marakez and SODIC communities, as well as Madinaty and Sarai on the Cairo–Suez Road.

Why NoVi

  • One accountable contractor: a single main design & build entity instead of separate individual technicians.
  • ISO 9001 certified quality management for finishing and decoration works.
  • Luxury Lifestyle Awards 2022 winner, Best Luxury Villa Interior Design, Egypt.
  • Design and execution in one contract: 3D design, BOQ, shop drawings and on-site checks that execution matches them.
  • Supplier and partner brands including Schneider, Futec, Mazloum, Crystal Asfour, HDL (home automation) and SEDAR.
  • Full scope: kitchens, custom furniture and joinery, and smart home.
  • Owners abroad: regular progress updates so you can follow the project remotely.

Related services

Projects nearby

Our work in and around New Cairo

All case studies

Integrated project delivery

Six stages. One line of responsibility.

From the first concept to the keys, one coordinated team owns every stage.

Architect's studio: scale model, drawings and material samples on the deskVisualisation
  1. Concept, design & visualisation

    Concept design and 3D visualisation that fix the direction before anything is priced or built.

    • Concept
    • 3D views
  2. Technical development & FF&E coordination

    Shop drawings, BOQ and value engineering, with furniture, fixtures and equipment coordinated alongside the architecture.

    • Shop drawings
    • BOQ
    • Value engineering
  3. Procurement & approvals

    Materials, suppliers and approvals secured in sequence, so the site never waits on a decision.

    • Suppliers
    • Approvals
  4. Construction & execution

    Structure, finishing, MEP and landscape delivered by coordinated site teams against one programme.

    • Site teams
    • One programme
  5. Quality & project control

    QA/QC, HSE, inspections and snagging built into the work, not left to the end.

    • QA/QC
    • HSE
    • Snagging
  6. Integrated solutions & handover

    Furniture installation, styling, testing and documentation, then the keys.

    • Styling
    • Testing
    • Documentation

Questions

Frequently asked questions

Straight answers to what clients ask us before a site survey. Not covered here? Ask the team directly.

Ask the team

How much does apartment finishing cost in New Cairo?

There is no fixed figure. Cost depends on area, finishing level, the unit's handover condition, the extent of electrical, plumbing and AC work, kitchens, wardrobes and material choices. Prices also move with material costs, so a generic per-metre rate is rarely reliable. NoVi gives you a BOQ-based quote after the site survey, itemising works and materials for your unit.

How long does it take to finish an apartment?

Once design and BOQ are approved, execution typically takes 4 to 8 months depending on area and scope. Major MEP changes or imported materials with long lead times extend it. Before signing with any contractor, ask for an expected schedule for your specific unit.

What is the difference between super lux and ultra super lux?

These labels have no official standard in Egypt and mean different things to different contractors. Generally, higher levels upgrade flooring, ceilings, lighting, AC preparation, sanitary ware and doors. What matters is a written BOQ listing every item with brand and specification.

Do I need compound management approval before finishing works?

In most compounds, yes. Management typically asks for drawings and contractor registration, may require a refundable deposit, and sets working hours and rules for workers and deliveries. Requirements differ by compound, so check your compound's rules before you plan dates; NoVi's team can advise on coordinating with management during the site survey.

Can I manage the finishing while living abroad?

Yes. You receive regular progress updates, and our team checks on site that execution matches the approved shop drawings, so you are not coordinating individual tradesmen yourself. Agree how and how often you will receive updates before works start.

What is the difference between core & shell and semi-finished?

Core & shell usually means the concrete structure and external walls with little or no internal work. Semi-finished typically adds basics such as plastering and electrical and plumbing conduits. What is actually delivered depends on your developer contract, so we start with a survey of existing conditions.

Do you offer interior design and execution together?

Yes. NoVi is a design & build contractor: interior design, 3D shots, BOQ, shop drawings and execution under one accountable entity.

Do you finish villas in Fifth Settlement too?

Yes. Our residential design & build work covers apartments and villas, and we won the Luxury Lifestyle Awards 2022 for Best Luxury Villa Interior Design in Egypt.

New Cairo

Book a site survey

Tell us about the property and we will arrange a visit, a video call or a call back.

  1. What you need
  2. Your project
  3. Meet the team
  4. Your details

Step 1 of 4

What do you need?

Choose all that apply — we’ll bring the right specialists to your project.

I am a…
Services · choose one or more
  • Free consultation
  • Reply within one business day
  • ISO 9001 certified quality