Egypt
Cairo Head Office
Bavaria Town Towers, Kattameya Road, Tower 3, 9th Floor, Unit 91, Cairo, Egypt- +20 106 778 8687
- Landline +20 2 2749 8958
- Landline +20 2 2749 8978
- info@novi-df.com
Contact Us
Cairo Head Office
Riyadh Office
Residential Design & Build · Egypt
How Egyptians living in the Gulf and Europe can get an apartment or villa in Egypt designed and finished remotely: developer handover, paperwork to arrange, compound rules, video design approvals, itemised BOQ and progress updates from one accountable team.
You bought an apartment or a villa in Egypt while working in Riyadh, Dubai, Doha, Kuwait or Europe. The developer is about to hand it over, or already has, as core and shell or semi-finished. Now you need it designed and finished, and you cannot fly back every month to chase a foreman. This page explains how apartment finishing in Egypt for expats works when the owner lives abroad: what you usually need to arrange yourself, what a design and build team should take off your plate, and how to keep control of design, budget and quality from another country.
NoVi Designs and Finishing is part of NoVi Holding. We are one accountable design and build team from the first site survey to handover, and our quality management for finishing and decoration works is ISO 9001 certified. Book a site survey and we will start with your unit as it really is on site.
It is written for Egyptians living in Saudi Arabia, the UAE, Qatar, Kuwait, Oman, Europe or North America who own a unit in a compound in New Cairo, Sheikh Zayed, 6th of October, the New Capital or the North Coast. Typical situations we hear about:
Owners abroad tend to share the same worries, and most of them are fair. The common problems are not about one bad tile. They come from how the job is organised:
A good remote setup answers each of these with structure: approved drawings, an itemised BOQ, a named team and regular updates you can actually compare with the plan.
With our residential design and build services, the same team prepares the design, the shop drawings and the BOQ, then executes the work and hands the unit over. For an owner abroad that matters more than for anyone else. You have one point of contact, the person who designed a detail is answerable for how it is built, and our site team checks the work against the approved drawings when you cannot be there yourself.
Finishing begins after you, or someone you authorise, take handover of the unit. Developers usually notify you that the unit is ready, then a walkthrough records any snags in structure, openings, plumbing points or electrical supply, and the handover report is signed once those points are dealt with. Procedures differ by developer and by contract, so read yours early.
If you cannot attend, it helps to have someone technical walk the unit with whoever holds your power of attorney. Where you authorise it and the developer allows access, our team can survey the unit early and point out technical items worth raising with the developer. Either way, our site survey and as-built 2D layout record what was actually delivered, because handover states vary and the catalogue is not always what you find on site.
Some steps sit with you as the owner, and it is better to start them early, ideally during a visit home:
NoVi does not take over these legal, utility or developer procedures. Our part is technical: preparing the design and shop drawings your compound asks to see, and planning the works around its rules.
Most compounds have their own rules for finishing works, and they vary by developer and change over time. Requirements usually include submitting drawings to the management before work starts, registering the contractor and workers, a refundable works deposit in some compounds, fixed working hours, and rules for material deliveries and debris removal. Exterior changes such as facades, window openings or pergolas are often restricted.
Check your compound rules as soon as you have a handover date. We review the requirements during the survey and plan the schedule around them, which avoids a team standing at the gate while you are thousands of kilometres away.
Our process has four stages, and each one is designed so you approve before anything is built:
Execution on our projects typically takes 4 to 8 months depending on scope, and larger villas can take longer. A detailed schedule is agreed for your project before works start.
You do not need to be in Cairo for design meetings. We run design reviews and approvals over video calls and WhatsApp, at a time that suits your working week in the Gulf or Europe. You see the layout options, the 3D visuals and the material selection, ask questions and request changes. Where texture or colour matters, such as marble, wood or fabrics, samples can be shown on camera or set aside for you to see on your next trip.
The aim is simple: every important decision is made and written down before the first wall is opened, so nothing on site depends on a phone call you missed.
We do not publish price lists or quote a price per square metre, because two units of the same size can need very different work. After the site survey and design, you receive an itemised BOQ that lists each item with its material, brand, quantity and price. For an owner abroad this is the main control tool. You can compare quotes like with like, see where the money goes, and refer back to the BOQ whenever a change is discussed.
Labels such as "super lux" have no official definition in Egypt. Ask for the BOQ, not the label.
Whoever you hire, a few habits protect owners who live outside Egypt:
Our payment terms are set out in your contract and discussed openly before you commit.
Material substitution is one of the biggest fears for owners abroad, and the best defence is detail. In our Design stage, materials are selected and recorded in the BOQ and shop drawings by type and specification. During execution, the site team checks the work against those approved drawings. If an item becomes unavailable, which happens with imported materials, the alternative is presented to you for approval instead of being installed quietly.
During execution you receive regular progress updates, so you can see the unit move from MEP rough-in to plaster, flooring, ceilings and joinery. Agree at the start how you want to receive updates, for example a project WhatsApp group with photos and short videos, and who your contact is. Because updates refer to approved drawings, you can see whether the socket, the AC grille or the niche is where it was meant to be, not just that work is happening.
Most owners abroad come home in summer, at Eid or at the end of the year. Those trips are valuable, so plan them around decision points rather than at random:
Tell us your travel dates early. We will try to line up the decisions that benefit from your presence with the days you are in Egypt.
A home that stays closed for months benefits from automation. Through partners such as HDL, systems can include lighting and AC control, intercom, access control and alarms that can typically be checked from your phone. The wiring is planned at the MEP stage, so it does not end up in surface trunking later. See our interior design in Egypt page for how design and systems come together.
Open these case studies to see the standard you would be approving from a distance. Each is described only as far as its own case study page goes:
NoVi executes projects in Egypt and Saudi Arabia. For details on compounds, handover states and local rules in each area, see our location guides:
Apartments and villas need different planning. A villa adds stairs, a roof, often a basement and a garden, and a much larger MEP scope, so remote decisions on AC, water pressure and waterproofing need even more care in the design stage.
Send us your unit details, the compound, the handover state and your next travel dates, and we will plan the site survey with you or with the person you authorise. Call or WhatsApp +20 106 778 8687, landline +20 2 2749 8958. Owners in Saudi Arabia can also call +966 54 346 1981. Our office is at Bavaria Town Towers, Kattameya Road, Tower 3, 9th Floor, Unit 91, Cairo, open Sunday to Thursday, 10:00 to 18:00 Cairo time.
Book a site survey or request a proposal.
Bought an apartment in the New Administrative Capital from abroad? Our New Capital apartment finishing guide covers handover, utility connections and 2026 cost ranges, so you know what to ask for before work starts.
Own an apartment in Sheikh Zayed or New Zayed? Our Sheikh Zayed apartment finishing guide has a section on running the job from abroad, plus compound fit-out rules and finishing levels.
Own a villa, townhouse or chalet in El Gouna? Our El Gouna finishing page covers Red Sea-ready specifications and how we run the project while you are away.
Integrated project delivery
From the first concept to the keys, one coordinated team owns every stage.

Concept design and 3D visualisation that fix the direction before anything is priced or built.
Shop drawings, BOQ and value engineering, with furniture, fixtures and equipment coordinated alongside the architecture.
Materials, suppliers and approvals secured in sequence, so the site never waits on a decision.
Structure, finishing, MEP and landscape delivered by coordinated site teams against one programme.
QA/QC, HSE, inspections and snagging built into the work, not left to the end.
Furniture installation, styling, testing and documentation, then the keys.
Questions
Straight answers to what clients ask us before a site survey. Not covered here? Ask the team directly.
Ask the teamYes. Design meetings and approvals can run over video calls and WhatsApp, the design, materials and itemised BOQ are agreed with you before work starts, and during execution you receive regular progress updates. Our site team checks the work against the approved drawings when you cannot be there.
Not necessarily. The survey can be arranged with a relative or the person who holds your power of attorney, and we share the as-built layout and findings with you afterwards. Many owners still plan one visit for the developer handover and any papers they must sign in person.
No. Power of attorney, utility contracts, meters and developer dues are usually arranged by the owner or a lawyer. Our part is technical: we prepare the design and shop drawings your compound asks to see and plan the works around its rules.
Materials are recorded in the BOQ and shop drawings by type and specification during the Design stage, and the site team checks execution against those approved drawings. If an item becomes unavailable, the alternative is presented to you for approval before it is installed.
There is no fixed price per square metre. Cost depends on the handover state, area, MEP changes, AC system, kitchen and joinery, materials and smart home scope. NoVi prepares an itemised BOQ quotation after the site survey and design, so you can see every item and its price.
Execution on our projects typically takes 4 to 8 months depending on scope, and large villas can take longer. Design, compound approvals and long-lead items add to the overall time, so a detailed schedule is agreed for your project before works start.
In most compounds, yes. Management usually asks for drawings, contractor registration and sometimes a refundable works deposit, and sets working hours and delivery rules. Rules vary by developer, so check them as soon as you have a handover date. We review them during the survey and plan around them.
Plan visits around decision points: handover and the site survey at the start, a visit before ceilings are closed or to see stone and wood samples, and a final visit for snagging and handover. Share your summer or Eid travel dates early so key decisions can line up with them.
Yes. NoVi executes projects in Egypt and Saudi Arabia, and owners in Saudi Arabia can call +966 54 346 1981 as well as our Egypt number +20 106 778 8687 on call or WhatsApp.
Egypt
Egypt
Tell us about the property and we will arrange a visit, a video call or a call back.
The full service
More areas we serve
