

Egypt · Finishing works
Villa & Apartment Finishing Company in Egypt
From red brick or semi-finished to a home you can move into: finishing that starts with a design and a priced BOQ, and ends with a unit that matches the drawings.
Contact Us
Cairo Head Office
Riyadh Office

Egypt · Finishing works
From red brick or semi-finished to a home you can move into: finishing that starts with a design and a priced BOQ, and ends with a unit that matches the drawings.
NoVi is a finishing company in Egypt trusted with compound-scale work: we deliver concrete and architectural finishing on Mivida Gardens — 200 villas in New Cairo. The same discipline goes into a single apartment in the Fifth Settlement or a villa in Sheikh Zayed.
Every finishing project is run under our ISO 9001:2015 quality system and inspected stage by stage, from masonry to the last coat of paint. In the New Administrative Capital we are also delivering finishing, landscape and infrastructure for Capital Hills — 240 units.
Project proof
Figures, roles and status from NoVi's 2026 corporate portfolio. Images are original visualisations inspired by each project, not site photographs.



300 m²
New Cairo
Design & finishing: interior and exterior, joinery, lighting, kitchen and bathrooms
01Finishing in Egypt
The labels are used loosely in Egypt; in our BOQ every item is specified by material and grade, so the label never replaces the detail.
| Level | What it usually includes | Often chosen for |
|---|---|---|
| Lux | Standard ceramic or porcelain, basic paint, standard sanitary ware, simple ceilings | Units for rent or resale |
| Super lux | Better porcelain or marble in reception, gypsum board ceilings with hidden lighting, upgraded sanitary ware, AC points prepared | Family apartments and townhouses |
| Ultra super lux | Natural marble, detailed gypsum work, premium paint and fittings, custom doors, full AC and lighting design | Luxury apartments, duplexes and villas |
| High-end | Fully bespoke: stone and wood cladding, feature ceilings, custom joinery throughout, lighting control and smart home | Villas and penthouses |
General market definitions for guidance. The specification in your NoVi BOQ is what defines your finishing level.

02Finishing in Egypt
Whether your unit is red brick, semi-finished or a finished home being upgraded, the scope is drawn and priced before work starts.
Layout changes built and walls plastered true, the base every later finish depends on.
Electrical, plumbing, AC and light-current routes installed and tested before they are closed in. See MEP works.
Marble, porcelain and parquet laid to the approved pattern, with levels checked room by room.
Gypsum board, cornices and hidden lighting coordinated with AC grilles and light points.
Aluminium, doors, dressing rooms and kitchens, built with our manufacturing partners and installed by our team.
Paint systems, sanitary ware and fittings, then snagging and a clean handover.
03Finishing in Egypt
From the portfolio
Real photography from our project galleries.

04Finishing in Egypt
Every developer runs its own finishing permit, and the rules decide when you can start and whether you get your deposit back.
05Finishing in Egypt
We record the unit's condition, agree the design and finishing level, and price every item in EGP.
Developer drawings submitted, deposit paid and long-lead items such as marble and joinery ordered early.
Masonry, electromechanical routes, plastering and waterproofing, inspected before being covered.
Flooring, ceilings, paint, doors, joinery and sanitary ware, installed to the shop drawings.
Typically 4–8 months for execution, depending on scope
Systems tested, snags closed and the unit handed over clean, ready for the deposit to be released.

06Finishing in Egypt
Two units of the same size can end up far apart in cost. These are the items that make the difference.
07Finishing in Egypt
Our finishing teams work across New Cairo and the Fifth Settlement, Madinaty, the New Administrative Capital, Sheikh Zayed and 6th of October, and on holiday homes on the North Coast. For the full picture of our Cairo office and services, visit the Egypt page; if you are still at the design stage, start with interior design in Cairo, or book a site survey.
Egypt
Questions
Straight answers to what clients ask us before a site survey. Not covered here? Ask the team directly.
Ask the teamFrom your unit, not from an average. We survey the unit, agree the design and finishing level, then price a BOQ item by item in EGP and issue a fixed quotation before work starts. The unit's condition, stone, AC and electrical scope and joinery move the number most.
Ultra super lux usually means natural marble, detailed gypsum work, premium paint and fittings and a full AC and lighting design, where super lux uses upgraded porcelain and simpler ceilings. In our BOQ the materials, not the label, define the level.
We prepare the drawings the developer requires, coordinate the submission with you and run the site to the compound's rules on hours, deliveries and debris, which is what keeps the finishing deposit refundable.
Not necessarily. At survey we check what the developer installed, from plaster to electrical routes, and keep whatever meets the design. The BOQ then shows exactly what is reused and what is replaced.
Yes. Selections are approved online against 3D views and samples, the permit is coordinated from Cairo, and you receive regular progress updates from site.
Yes. West Cairo villas are served by the same site teams as New Cairo, and North Coast homes are planned backwards from the start of the summer season, with deliveries organised before works begin.
Start a project
Tell us the compound, area and condition of your unit. We will arrange a site survey and price your finishing item by item.
